Clean energy news from India and beyondSubmit a story
Solar

Edify proposes 800 MW solar and battery project in southern Queensland

Edify Energy has lodged a federal environmental assessment for an 800 MW solar farm and 800 MW battery in southern Queensland. The proposal, situated near the New South Wales border, aims to retain most local habitats while requiring the removal of a small area of flying fox habitat.

Luminity News Desk ·

AI-generated illustration: Edify proposes 800 MW solar and battery project in southern Queensland
Image: AI-generated illustration (Luminity / Workers AI)

Edify Energy has proposed a major renewable energy development in southern Queensland, comprising an 800 MW solar farm and a 800 MW four-hour battery storage system. The project site is located north of the New South Wales border, situated between two state forests.

The developer has lodged the proposal for assessment under the federal Environment Protection and Biodiversity Conservation Act.

Advertisement

Site and Environmental Design

The development footprint spans approximately 2,000 hectares. Survey efforts within the project area did not record koalas, and the environmental impact assessment states the species was not recorded despite extensive survey effort. However, the design accounts for potential future presence; if koalas re-emerge, the planned fencing will be "koala permeable."

The site layout requires the removal of 3.1 hectares of habitat suitable for grey-headed flying foxes. In contrast, the proposal aims to preserve 98 to 100 per cent of habitats for 13 listed endangered species, including specific birds, mammals, and Murray cod. The environmental impact assessment concludes that the proposed action has been designed to avoid significant impacts to Matters of National Environmental Significance.

Construction and Local Impact

  • The build phase will require 600 workers and take approximately three years to complete.
  • Edify Energy plans to construct housing for all 600 construction workers on site.
  • The Goondiwindi region currently has a 0.1 per cent rental vacancy rate and near full employment.

Community Benefits and Policy

Glenarbon is located within a 100 km radius of 12 other utility-scale renewable projects. Goondiwindi mayor Lawrence Springborg stated that future projects will provide genuine solutions to his region’s needs, rather than one-off 'sugar hits'.

Edify Energy has not yet signed a community benefits agreement (CBA) with Goondiwindi regional council. The council currently lacks dedicated policy for renewable energy CBAs. If rates match those in the Western Downs, the potential annual fund would be $850/MW for solar and $150/MWh for battery. At the proposed size, the estimated first year payment would be $1.16 million.

Regulatory Context and Regional Development Pressure

The environmental impact assessment notes that the 3.1 hectares of clearing will not remove entire habitat patches or fragment vegetation connected to areas outside the project, preserving overall connectivity. While koalas were absent from recent surveys, the nearest record occurred 26 km southeast in 2009. The company warns that overlapping construction phases could create cumulative pressure on housing, health services, road infrastructure, and community engagement capacity. Only three of these dozen projects are located directly in the Goondiwindi area. Springborg, a former Nationals state MP who supported the state government’s CBA system introduced last year, cited the approval of six large wind and solar projects in his shire, including the 923 MW McIntyre wind farm, as examples where the community was largely ignored. He told the Clean Energy Council’s Queensland Energy Summit in September that he is determined to secure long-term benefits rather than temporary gains.

Edify EnergyQueenslandSolarBatteryEnvironmental Assessment

Source: RenewEconomy. This article is an original Luminity report based on the linked source.

Advertisement